
Active-Part Preparation
Oven-based drying is used as part of active-part preparation before oil filling and final assembly.
Factory infrastructure organized around transformer production, switchgear assembly, material handling, testing and dispatch.

A single controlled workflow spans winding, fabrication, drying, oil processing, assembly, testing and dispatch — supported by overhead material handling and in-house utilities.
HV/LV winding preparation and insulation workstations.
Tank and structural component fabrication capability.
Controlled drying of active parts before oil filling.
Oil filtration / processing support before final filling.
Material movement and transformer handling across the shop floor.
Dedicated instruments for routine transformer electrical checks.

Oven-based drying is used as part of active-part preparation before oil filling and final assembly.

In-house steel fabrication supports transformer tank and structural component production.

In-house oil storage and processing supports controlled, filtered oil filling.
HV/LV coils
CRGO assembly
Core-coil integration
MS fabrication
Controlled oven process
Filtration / processing
Accessories & sealing
Filtered oil filling
Routine electrical tests
Finishing & release
Share your rating, voltage class, quantity, utility / project specification and delivery location — we will align the offer and documentation.