Tripod Infrastructure Pvt. Ltd.
Tripod transformer testing panel
Quality Assurance

Testing, Verification & Compliance

Routine test capability and documentation support for utility, tender and project requirements.

Testing Framework

Documentation aligned to applicable specifications.

Testing and acceptance are performed against the purchase specification, BIS/BEE requirements and applicable Indian Standards. For tender submissions, current signed certificates, licence pages and type-test documents should be attached as applicable.

BIS / IS 1180

Licensed distribution-transformer scope referenced in company credentials.

BEE Energy Efficiency

Star-level certification and energy-efficiency schedule for applicable ratings.

Oil Quality

Processed transformer oil with BDV target above 60 kV before filling.

Loss Verification

No-load and load-loss measurements verified on the test panel.

Vector / Ratio

Voltage ratio and vector group verification before dispatch.

Impedance

Impedance verification against rating and purchase specification.

Transformer test equipment room

Dedicated Test Room

Electrical test equipment is arranged in a dedicated room adjacent to the production floor for controlled measurements and record preparation.

Transformers arranged for testing and inspection

Inspection & Dispatch Readiness

Units are arranged for final checks, identification and release before dispatch to utility or project customers.

Have a tender, schedule or project requirement?

Share your rating, voltage class, quantity, utility / project specification and delivery location — we will align the offer and documentation.